RAAF Richmond 25m Range Upgrade
BOUW consulted as Range Subject Matter Experts on the RAAF Richmond 25m Range Upgrade which saw the existing 25m Barracks Range at RAAF Richmond being upgraded to DEQMS 25m Barrack Range – Type B (2000) standard through:
- Installation of 3m high ballistic side walls
- Levelling of the range floor
- Installation of shredded rubber flooring to firing mound floor
- Replacement of individual lane markers within firing range floorv
BOUW conducted a review of the Performance Documentation prepared by Stantec for compliance with ballistic safety and the intent of DEQMS 25m Barrack Range – Type B (2000) design and provided a written report and recommendations.
Related Projects
John Moroney Correctional Complex Range Peer Review
John Moroney Correctional Complex Range Peer Review BOUW were engaged by BGIS to complete a peer review of the range design and maintenance recommendations for
Shoalwater Bay Remediation
Shoalwater Bay Remediation BOUW assisted the successful Managing Contractor (MC) in drafting the winning strategy to secure the Managing Contractor Contract for the Shoalwater Bay
Joint Health Command Garrison Facilities Upgrade Project
Joint Health Command Garrison Facilities Upgrade Project With the help of BOUW, Joss Construction won the Joint Health Command Garrison Facilities Upgrade Project for the